O PM Peak Hour Traffic on Adj. Lungo 1 6 0 m. Minor revisions have been made to the land use description pages for private school (K-8) (Land Use 534), private school (K-12) (Land Use 536), and charter elementary school (Land Use 537). The revisions include removal of source 906 from land uses 534 and 536 and the addition of this source to land use.
- PeakHour 4.0 MAC OS X PeakHour 4.0 Size: 15 MB PeakHour is a beautiful, network traffic visualizer that lives in your Mac OS menu. It provides an instant view of your Internet or WiFi activity in real time. PeakHour is ideal for monitoring your compatible network.
- Peakhour.com - Contact us for any business inquiries.
- Isn't PHF = Peak volume in the 15min. Interval / 4. Peak Hour Volume 15 min. And this is after choosing the critical hour given a two hour count? I'm just confused if there's a factor for the non straight through turns and trucks.
- PeakHour assumes the other side of your Internet connection is 2 hops away: Hop #1: Your router or firewall Hop #2: Your ISP This is the case for most residential Internet connections but may differ if your network is more complex (e.g. You do double-NAT or have more than one router).
Peak Hour Volume, Design Flow Rate, PHF
It is commonly known in your area that the heaviest traffic flow rates occur between 4:00 PM and 6:30 PM. Your assignment for the day is to find the peak hour volume, peak hour factor (PHF), and the actual or design flow rate for an existing one-lane approach. To do this, you obtain a click-counter and position yourself at the intersection. For each fifteen-minute interval, you record the numbers of right-turns, left-turns, straight-through trucks, and straight-through passenger cars. Your tabulated values are as shown below.
Time Interval | Left Turns | Right Turns | ST Trucks | ST Cars |
4:00-4:15 | 5 | 10 | 6 | 30 |
4:15-4:30 | 6 | 15 | 8 | 26 |
4:30-4:45 | 4 | 7 | 10 | 35 |
4:45-5:00 | 7 | 16 | 8 | 40 |
5:00-5:15 | 10 | 13 | 6 | 49 |
5:15-5:30 | 9 | 12 | 12 | 55 |
5:30-5:45 | 14 | 15 | 8 | 65 |
5:45-6:00 | 12 | 12 | 10 | 50 |
6:00-6:15 | 10 | 9 | 8 | 39 |
6:15-6:30 | 9 | 12 | 4 | 30 |
If a truck is equal to 1.5 passenger cars and a right-turn is as well, and if a left-turn is equal to 2.5 passenger cars, then calculate the peak hour volume, peak hour factor (PHF), and the actual (design) flow rate for this approach.
[Solution Shown Below]
Solution
The first step in this solution is to find the total traffic volume for each 15 minute period in terms of passenger car units. This is done by multiplying the number of trucks by 1.5, the number of right turns by 1.5, and the number of left turns by 2.5. We then add these three numbers and the volume of straight-through cars together to get the total volume of traffic serviced in each interval. Carrot weather 1 3 4 – talking forecast robot. Once we have this, we can locate the hour with the highest volume and the 15 minute interval with the highest volume. The peak hour is shown in blue below with the peak 15 minute period shown in a darker shade of blue.
Time Interval | Interval Volume (pcu) |
4:00-4:15 | 67 |
4:15-4:30 | 76 |
4:30-4:45 | 71 |
4:45-5:00 | 94 |
5:00-5:15 | 103 |
5:15-5:30 | 114 |
5:30-5:45 | 135 |
5:45-6:00 | 113 |
6:00-6:15 | 90 |
6:15-6:30 | 77 |
The peak hour volume is just the sum of the volumes of the four 15 minute intervals within the peak hour (464 pcu). The peak 15 minute volume is 135 pcu in this case. The peak hour factor (PHF) is found by dividing the peak hour volume by four times the peak 15 minute volume.
PHF = 464 /(4 * 135) = 0.86
Peak Hour 4
Iskysoft itransfer 4 5 2 1. The actual (design) flow rate can be calculated by dividing the peak hour volume by the PHF, 464/0.86 = 540 pcu/hr, or by multiplying the peak 15 minute volume by four, 4 * 135 = 540 pcu/hr.